Epoch Solutions Group Completes Tucson Electric Power Smallworld Upgrade

//Epoch Solutions Group Completes Tucson Electric Power Smallworld Upgrade

Epoch Solutions Group Completes Tucson Electric Power Smallworld Upgrade

Epoch Solutions Group successfully completed the GE Smallworld upgrade for Tucson Electric Power, moving them from CST version 4.1 to 4.3. This effort employed the Epoch Solutions Group in-house technology including Code Locator, Module Searcher and Method Reporter. Using these tools allowed Epoch Solutions Group to efficiently identify source code requiring an upgrade. This effort was completed on time and within the defined budget.

2017-04-14T18:13:55+00:00 June 30th, 2013|Blog|